This storage power and cooling calculator turns the electrical draw of your equipment into the numbers that facilities teams need: heat in BTU per hour, cooling in tons, apparent power in kVA, current in amps and the circuit rating to ask for. Enter the power per unit, how many units you have, the voltage and your redundancy, and it works out the rest. Use it before you order a new array or a rack of shelves.
Result
The result updates automatically as you change any input.
Formula and worked steps
Formulas used
- Heat (BTU/h) = watts x 3.412141633
- Cooling tons = BTU/h / 12,000
- kVA = kW / power factor
- Single-phase amps = VA / volts; three-phase amps = VA / (sqrt(3) x volts)
- Circuit rating needed = amps / derating
- All electrical power ends up as heat in the room. Use nameplate or measured power for real draw, not the power supply rating.
- 1 W = 3.412141633 BTU(IT)/h; 1 ton of refrigeration = 12,000 BTU/h.
- The 80% derating and the breaker sizes follow common US practice for continuous loads. Your local electrical code and electrician decide.
- With two independent feeds, each feed must carry the full load after a failure, so each is sized for 100%.
References
Planning A/B feeds, breaker loading and a whole cabinet? Use the rack power calculator; this page focuses on heat and cooling for storage equipment.
Powering devices over Ethernet? The PoE power budget calculator totals PoE class power against a switch budget and converts it to heat.
What is a power and cooling budget?
A storage system turns almost every watt it draws into heat. The electrical circuit has to supply those watts, and the room’s cooling has to remove the same energy as heat. A budget is the pair of figures that says whether the building can support the equipment.
Watts, kW and kVA
Watts measure real power. Kilowatts are watts divided by 1,000. Apparent power in kVA is higher, because it is real power divided by the power factor. Circuits and UPS units are rated against apparent power, so kVA is the number that matters for sizing.
BTU per hour and tons
Cooling capacity is quoted in BTU per hour, or in tons. One watt equals 3.412 BTU per hour, and one ton of cooling removes 12,000 BTU per hour. A rack drawing 5 kW produces about 17,000 BTU per hour.
Amps, voltage and phase
Current depends on the supply. On a single-phase circuit, amps equal volt-amperes divided by volts. On three phase, amps equal volt-amperes divided by the square root of 3 times the line voltage. Higher voltage means lower current for the same load.
How the storage power and cooling calculator works
The tool multiplies power per unit by the number of units, then applies the standard conversions. It shows each step in the worked-steps panel.
Formulas
- Heat (BTU/h) = watts x 3.412141633
- Cooling tons = BTU/h / 12,000
- kVA = kW / power factor
- Single-phase amps = VA / volts
- Three-phase amps = VA / (1.732 x volts)
- Circuit rating needed = amps / derating
Worked example: 5,000 W
Four units of 1,250 W draw 5,000 W. That is 17,060.7 BTU per hour and 1.42 tons of cooling. At a power factor of 0.9 the load is 5.56 kVA.
| Supply | Current | Circuit needed at 80% |
|---|---|---|
| 120 V single phase | 46.3 A | 57.9 A, so 60 A |
| 208 V single phase | 26.7 A | 33.4 A, so 40 A |
| 230 V single phase | 24.2 A | 30.2 A, so 40 A |
| 208 V three phase | 15.4 A | 19.3 A, so 20 A |
The circuit column applies the common US rule that a continuous load should use no more than 80% of a breaker’s rating, and then rounds up to a standard breaker size. Your local code and electrician decide the real figure.
Redundant feeds
With two independent feeds, called 2N, each feed must be able to carry the whole load, because either one may be the only one left after a failure. The tool therefore sizes each feed for 100% and tells you there are two. With N+1 power supplies on one feed set, the feed carries the load and the supplies share it.
Scaling up
Ten racks each drawing 5 kW add up to 50 kW, which is 170,607 BTU per hour or 14.2 tons of cooling. Multiplying one rack’s figures is a quick way to size a row or a room, and the unit count field does exactly that for identical equipment.
Why it matters for SAN and storage admins
Power and cooling limit a data center before space does. A new array that fits in the rack and the budget may still not fit the circuit, or may push a row past its cooling capacity. The storage power and cooling calculator makes that check a few minutes’ work, and it gives facilities the figures in their own units, which shortens the conversation.
Use measured or nameplate power, not the power supply rating. A 1,600 W supply on an array that draws 600 W is not a 1,600 W load, and designing to the supply rating wastes capacity in every rack. Vendors publish typical and maximum draw, and your own measurements are better.
Use it when you:
- Check a purchase against the available circuits.
- Tell the facilities team how much heat a new rack adds.
- Compare the power cost of two designs.
- Decide between 120 V, 208 V and 230 V feeds.
Best practices and common mistakes
- Use the power the equipment actually draws, and include peak draw at start-up if the vendor lists one.
- Plan cooling for the heat, and for redundancy in the cooling units themselves.
- Size each feed for the full load when feeds are redundant.
- Leave headroom. Running a circuit at its limit leaves nothing for growth.
- Remember that fans, drives and controllers draw more at high load and when a power supply has failed.
- Follow local electrical code for breaker sizes and derating. This tool uses common US practice.
A frequent mistake is to size circuits for the average draw of the rack and ignore the failure case. In a dual-feed design, the surviving feed carries everything.
FAQs
How do I convert watts to BTU per hour?
Multiply watts by 3.412. 5,000 W is about 17,061 BTU/h, which is 1.42 tons of cooling.
How many amps does 5,000 W draw at 208 V?
At a power factor of 0.9 it is 5.56 kVA, or about 26.7 A on a single-phase 208 V circuit. At 120 V it is 46.3 A and at 230 V it is 24.2 A.
Why are redundant feeds each sized for the full load?
If one feed fails, the other carries everything, so each must be able to carry 100% of the load on its own.
Next, try the rack unit space planner, the cost per GB storage calculator and the SAN switch port calculator, or browse the full list of storage calculators. For the power and heat of Power over Ethernet devices, use the PoE power budget calculator. To check breaker loading, A and B feeds and three-phase current for the whole cabinet, use the rack power calculator, which shares its power maths with this page.